Apollo 11 Timeline
Event |
GET (hhh:mm:ss) |
GMT Time |
GMT Date |
Terminal countdown started. |
-028:00:00 |
21:00:00 |
14 Jul 1969 |
Scheduled 11-hour hold at T-9 hours. |
-009:00:00 |
16:00:00 |
15 Jul 1969 |
Countdown resumed at T-9 hours. |
-009:00:00 |
03:00:00 |
16 Jul 1969 |
Scheduled 1-hour 32-minute hold at T-3 hours 30 minutes. |
-003:30:00 |
08:30:00 |
16 Jul 1969 |
Countdown resumed at T-3 hours 30 minutes. |
-003:30:00 |
10:02:00 |
16 Jul 1969 |
Guidance reference release. |
-000:00:16.968 |
13:31:43 |
16 Jul 1969 |
S-IC engine start command. |
-000:00:08.9 |
13:31:51 |
16 Jul 1969 |
S-IC engine ignition (#5). |
-000:00:06.4 |
13:31:53 |
16 Jul 1969 |
All S-IC engines thrust OK. |
-000:00:01.6 |
13:31:58 |
16 Jul 1969 |
Range zero. |
000:00:00.00 |
13:32:00 |
16 Jul 1969 |
All holddown arms released (1st motion). |
000:00:00.3 |
13:32:00 |
16 Jul 1969 |
Liftoff (umbilical disconnected) (1.07 g). |
000:00:00.63 |
13:32:00 |
16 Jul 1969 |
Tower clearance yaw maneuver started. |
000:00:01.7 |
13:32:01 |
16 Jul 1969 |
Yaw maneuver ended. |
000:00:09.7 |
13:32:09 |
16 Jul 1969 |
Pitch and roll maneuver started. |
000:00:13.2 |
13:32:13 |
16 Jul 1969 |
Roll maneuver ended. |
000:00:31.1 |
13:32:31 |
16 Jul 1969 |
Mach 1 achieved. |
000:01:06.3 |
13:33:06 |
16 Jul 1969 |
Maximum dynamic pressure (735.17 lb/ft2). |
000:01:23.0 |
13:33:23 |
16 Jul 1969 |
Maximum bending moment (33,200,000 lbf-in). |
000:01:31.5 |
13:33:31 |
16 Jul 1969 |
S-IC center engine cutoff command. |
000:02:15.2 |
13:34:15 |
16 Jul 1969 |
Pitch maneuver ended. |
000:02:40.0 |
13:34:40 |
16 Jul 1969 |
S-IC outboard engine cutoff. |
000:02:41.63 |
13:34:41 |
16 Jul 1969 |
S-IC maximum total inertial acceleration (3.94 g). |
000:02:41.71 |
13:34:41 |
16 Jul 1969 |
S-IC maximum Earth-fixed velocity. S-IC/S-II separation command. |
000:02:42.30 |
13:34:42 |
16 Jul 1969 |
S-II engine start command. |
000:02:43.04 |
13:34:43 |
16 Jul 1969 |
S-II ignition. |
000:02:44.0 |
13:34:44 |
16 Jul 1969 |
S-II aft interstage jettisoned. |
000:03:12.3 |
13:35:12 |
16 Jul 1969 |
Launch escape tower jettisoned. |
000:03:17.9 |
13:35:17 |
16 Jul 1969 |
Iterative guidance mode initiated. |
000:03:24.1 |
13:35:24 |
16 Jul 1969 |
S-IC apex. |
000:04:29.1 |
13:36:29 |
16 Jul 1969 |
S-II center engine cutoff. |
000:07:40.62 |
13:39:40 |
16 Jul 1969 |
S-II maximum total inertial acceleration (1.82 g). |
000:07:40.70 |
13:39:40 |
16 Jul 1969 |
S-IC impact (theoretical). |
000:09:03.7 |
13:41:03 |
16 Jul 1969 |
S-II outboard engine cutoff. |
000:09:08.22 |
13:41:08 |
16 Jul 1969 |
S-II maximum Earth-fixed velocity. S-II/S-IVB separation command. |
000:09:09.00 |
13:41:09 |
16 Jul 1969 |
S-IVB 1st burn start command. |
000:09:09.20 |
13:41:09 |
16 Jul 1969 |
S-IVB 1st burn ignition. |
000:09:12.20 |
13:41:12 |
16 Jul 1969 |
S-IVB ullage case jettisoned. |
000:09:21.0 |
13:41:21 |
16 Jul 1969 |
S-II apex. |
000:09:47.0 |
13:41:47 |
16 Jul 1969 |
S-IVB 1st burn cutoff. |
000:11:39.33 |
13:43:39 |
16 Jul 1969 |
S-IVB 1st burn maximum total inertial acceleration (0.69 g). |
000:11:39.41 |
13:43:39 |
16 Jul 1969 |
Earth orbit insertion. S-IVB 1st burn maximum Earth-fixed velocity. |
000:11:49.33 |
13:43:49 |
16 Jul 1969 |
Maneuver to local horizontal attitude started. |
000:11:59.3 |
13:43:59 |
16 Jul 1969 |
Orbital navigation started. |
000:13:21.1 |
13:45:21 |
16 Jul 1969 |
S-II impact (theoretical). |
000:20:13.7 |
13:52:13 |
16 Jul 1969 |
S-IVB 2nd burn restart preparation. |
002:34:38.2 |
16:06:38 |
16 Jul 1969 |
S-IVB 2nd burn restart command. |
002:44:08.2 |
16:16:08 |
16 Jul 1969 |
S-IVB 2nd burn ignition (STDV open). |
002:44:16.2 |
16:16:16 |
16 Jul 1969 |
S-IVB 2nd burn cutoff. |
002:50:03.03 |
16:22:03 |
16 Jul 1969 |
S-IVB 2nd burn maximum total inertial acceleration (1.45 g). |
002:50:03.11 |
16:22:03 |
16 Jul 1969 |
S-IVB 2nd burn maximum Earth-fixed velocity. |
002:50:03.5 |
16:22:03 |
16 Jul 1969 |
S-IVB safing procedures started. |
002:50:03.8 |
16:22:03 |
16 Jul 1969 |
Translunar injection. |
002:50:13.03 |
16:22:13 |
16 Jul 1969 |
Maneuver to local horizontal attitude started. |
002:50:23.0 |
16:22:23 |
16 Jul 1969 |
Orbital navigation started. |
002:50:23.9 |
16:22:23 |
16 Jul 1969 |
Maneuver to transposition and docking attitude started. |
003:05:03.9 |
16:37:03 |
16 Jul 1969 |
CSM separated from S-IVB. |
003:15:23.0 |
16:47:23 |
16 Jul 1969 |
CSM separation maneuver ignition. |
003:17:04.6 |
16:49:04 |
16 Jul 1969 |
CSM separation maneuver cutoff. |
003:17:11.7 |
16:49:11 |
16 Jul 1969 |
CSM docked with LM/S-IVB. |
003:24:03.7 |
16:56:03 |
16 Jul 1969 |
CSM/LM ejected from S-IVB. |
004:17:03.0 |
17:49:03 |
16 Jul 1969 |
CSM/LM evasive maneuver from S-IVB ignition. |
004:40:01.72 |
18:12:01 |
16 Jul 1969 |
CSM/LM evasive maneuver from S-IVB cutoff. |
004:40:04.65 |
18:12:04 |
16 Jul 1969 |
S-IVB maneuver to lunar slingshot attitude initiated. |
004:41:07.6 |
18:13:07 |
16 Jul 1969 |
S-IVB lunar slingshot maneuver - LH2 tank CVS opened. |
004:51:07.7 |
18:23:07 |
16 Jul 1969 |
S-IVB lunar slingshot maneuver - LOX dump started. |
005:03:07.6 |
18:35:07 |
16 Jul 1969 |
S-IVB lunar slingshot maneuver - LOX dump ended. |
005:04:55.8 |
18:36:55 |
16 Jul 1969 |
S-IVB lunar slingshot maneuver - APS ignition. |
005:37:47.6 |
19:09:47 |
16 Jul 1969 |
S-IVB lunar slingshot maneuver - APS cutoff. |
005:42:27.8 |
19:14:27 |
16 Jul 1969 |
S-IVB maneuver to communications attitude initiated. |
005:42:48.8 |
19:14:48 |
16 Jul 1969 |
TV transmission started (recorded at Goldstone and transmitted to Houston at 011:26). |
010:32 |
00:04 |
17 Jul 1969 |
TV transmission ended. |
010:48 |
00:20 |
17 Jul 1969 |
Midcourse correction ignition. |
026:44:58.64 |
16:16:58 |
17 Jul 1969 |
Midcourse correction cutoff. |
026:45:01.77 |
16:17:01 |
17 Jul 1969 |
TV transmission started. |
030:28 |
20:00 |
17 Jul 1969 |
TV transmission ended. |
031:18 |
20:50 |
17 Jul 1969 |
TV transmission started. |
033:59 |
23:31 |
17 Jul 1969 |
TV transmission ended. |
034:35 |
00:07 |
18 Jul 1969 |
TV transmission started. |
055:08 |
20:40 |
18 Jul 1969 |
CDR and LMP entered LM for initial inspection. |
055:30 |
21:02 |
18 Jul 1969 |
TV transmission ended. |
056:44 |
22:16 |
18 Jul 1969 |
CDR and LMP entered CM. |
057:55 |
23:27 |
18 Jul 1969 |
Equigravisphere. |
061:39:55 |
03:11:55 |
19 Jul 1969 |
Lunar orbit insertion ignition. |
075:49:50.37 |
17:21:50 |
19 Jul 1969 |
Lunar orbit insertion cutoff. |
075:55:47.90 |
17:27:47 |
19 Jul 1969 |
Sighting of an illumination in the Aristarchus region. 1st time, a lunar transient event sighted by an observer in space. |
077:13 |
18:45 |
19 Jul 1969 |
TV transmission started. |
078:20 |
19:52 |
19 Jul 1969 |
S-IVB closest approach to lunar surface. |
078:42 |
20:14 |
19 Jul 1969 |
TV transmission ended. |
079:00 |
20:32 |
19 Jul 1969 |
Lunar orbit circularization ignition. |
080:11:36.75 |
21:43:36 |
19 Jul 1969 |
Lunar orbit circularization cutoff. |
080:11:53.63 |
21:43:53 |
19 Jul 1969 |
LMP entered CM for initial power-up and system checks. |
081:10 |
22:42 |
19 Jul 1969 |
LMP entered CM. |
083:35 |
01:07 |
20 Jul 1969 |
CDR and LMP entered LM for final preparations for descent. |
095:20 |
12:52 |
20 Jul 1969 |
LMP entered CM. |
097:00 |
14:32 |
20 Jul 1969 |
LMP entered LM. |
097:30 |
15:02 |
20 Jul 1969 |
LM system checks started. |
097:45 |
15:17 |
20 Jul 1969 |
LM system checks ended. |
100:00 |
17:32 |
20 Jul 1969 |
CSM/LM undocked. |
100:12:00.0 |
17:44:00 |
20 Jul 1969 |
CSM/LM separation maneuver ignition. |
100:39:52.9 |
18:11:52 |
20 Jul 1969 |
CSM/LM separation maneuver cutoff. |
100:40:01.9 |
18:12:01 |
20 Jul 1969 |
LM descent orbit insertion ignition (LM SPS). |
101:36:14 |
19:08:14 |
20 Jul 1969 |
LM descent orbit insertion cutoff. |
101:36:44 |
19:08:44 |
20 Jul 1969 |
LM acquisition of data. |
102:17:17 |
19:49:17 |
20 Jul 1969 |
LM landing radar on. |
102:20:53 |
19:52:53 |
20 Jul 1969 |
LM abort guidance aligned to primary guidance. |
102:24:40 |
19:56:40 |
20 Jul 1969 |
LM yaw maneuver to obtain improved communications. |
102:27:32 |
19:59:32 |
20 Jul 1969 |
LM altitude 50,000 feet. |
102:32:55 |
20:04:55 |
20 Jul 1969 |
LM propellant settling firing started. |
102:32:58 |
20:04:58 |
20 Jul 1969 |
LM powered descent engine ignition. |
102:33:05.01 |
20:05:05 |
20 Jul 1969 |
LM fixed throttle position. |
102:33:31 |
20:05:31 |
20 Jul 1969 |
LM face-up maneuver completed. |
102:37:59 |
20:09:59 |
20 Jul 1969 |
LM 1202 alarm. |
102:38:22 |
20:10:22 |
20 Jul 1969 |
LM radar updates enabled. |
102:38:45 |
20:10:45 |
20 Jul 1969 |
LM altitude less than 30,000 feet and velocity less than 2,000 feet per second (landing radar velocity update started). |
102:38:50 |
20:10:50 |
20 Jul 1969 |
LM 1202 alarm. |
102:39:02 |
20:11:02 |
20 Jul 1969 |
LM throttle recovery. |
102:39:31 |
20:11:31 |
20 Jul 1969 |
LM approach phase entered. |
102:41:32 |
20:13:32 |
20 Jul 1969 |
LM landing radar antenna to position 2. |
102:41:37 |
20:13:37 |
20 Jul 1969 |
LM attitude hold mode selected (check of LM handling qualities). |
102:41:53 |
20:13:53 |
20 Jul 1969 |
LM automatic guidance enabled. |
102:42:03 |
20:14:03 |
20 Jul 1969 |
LM 1201 alarm. |
102:42:18 |
20:14:18 |
20 Jul 1969 |
LM landing radar switched to low scale. |
102:42:19 |
20:14:19 |
20 Jul 1969 |
LM 1202 alarm. |
102:42:43 |
20:14:43 |
20 Jul 1969 |
LM 1202 alarm. |
102:42:58 |
20:14:58 |
20 Jul 1969 |
LM landing point redesignation. |
102:43:09 |
20:15:09 |
20 Jul 1969 |
LM altitude hold. |
102:43:13 |
20:15:13 |
20 Jul 1969 |
LM abort guidance attitude updated. |
102:43:20 |
20:15:20 |
20 Jul 1969 |
LM rate of descent landing phase entered. |
102:43:22 |
20:15:22 |
20 Jul 1969 |
LM landing radar data not good. |
102:44:11 |
20:16:11 |
20 Jul 1969 |
LM landing data good. |
102:44:21 |
20:16:21 |
20 Jul 1969 |
LM fuel low-level quantity light. |
102:44:28 |
20:16:28 |
20 Jul 1969 |
LM landing radar data not good. |
102:44:59 |
20:16:59 |
20 Jul 1969 |
LM landing radar data good. |
102:45:03 |
20:17:03 |
20 Jul 1969 |
1st evidence of surface dust disturbed by descent engine. |
102:44:35 |
20:16:35 |
20 Jul 1969 |
LM lunar landing. |
102:45:39.9 |
20:17:39 |
20 Jul 1969 |
LM powered descent engine cutoff. |
102:45:41.40 |
20:17:41 |
20 Jul 1969 |
Decision made to proceed with EVA prior to first rest period. |
104:40:00 |
22:12:00 |
20 Jul 1969 |
Preparation for EVA started. |
106:11:00 |
23:43:00 |
20 Jul 1969 |
EVA started (hatch open). |
109:07:33 |
02:39:33 |
21 Jul 1969 |
CDR completely outside LM on porch. |
109:19:16 |
02:51:16 |
21 Jul 1969 |
Modular equipment stowage assembly deployed (CDR). |
109:21:18 |
02:53:18 |
21 Jul 1969 |
First clear TV picture received. |
109:22:00 |
02:54:00 |
21 Jul 1969 |
CDR at foot of ladder (starts to report, then pauses to listen). |
109:23:28 |
02:55:28 |
21 Jul 1969 |
CDR at foot of ladder and described surface as “almost like a powder.” |
109:23:38 |
02:55:38 |
21 Jul 1969 |
1st step taken lunar surface (CDR). “That’s one small step for a man…one giant leap for mankind.” |
109:24:15 |
02:56:15 |
21 Jul 1969 |
CDR started surface examination and description, assessed mobility and described effects of LM descent engine. |
109:24:48 |
02:56:48 |
21 Jul 1969 |
CDR ended surface examination. LMP started to send down camera. |
109:26:54 |
02:58:54 |
21 Jul 1969 |
Camera installed on RCU bracket, LEC stored on secondary strut of LM landing gear. |
109:30:23 |
03:02:23 |
21 Jul 1969 |
Surface photography (CDR). |
109:30:53 |
03:02:53 |
21 Jul 1969 |
Contingency sample collection started (CDR). |
109:33:58 |
03:05:58 |
21 Jul 1969 |
Contingency sample collection ended (CDR). |
109:37:08 |
03:09:08 |
21 Jul 1969 |
LMP started egress from LM. |
109:39:57 |
03:11:57 |
21 Jul 1969 |
LMP at top of ladder. Descent photographed by CDR. |
109:41:56 |
03:13:56 |
21 Jul 1969 |
LMP on lunar surface. |
109:43:16 |
03:15:16 |
21 Jul 1969 |
Surface examination and examination of landing effects on surface and on LM started (CDR, LMP). |
109:43:47 |
03:15:47 |
21 Jul 1969 |
Insulation removed from modular equipment stowage assembly (CDR). |
109:49:06 |
03:21:06 |
21 Jul 1969 |
TV camera focal distance adjusted (CDR). |
109:51:35 |
03:23:35 |
21 Jul 1969 |
Plaque unveiled (CDR). |
109:52:19 |
03:24:19 |
21 Jul 1969 |
Plaque read (CDR). |
109:52:40 |
03:24:40 |
21 Jul 1969 |
TV camera redeployed. Panoramic TV view started (CDR). |
109:59:28 |
03:31:28 |
21 Jul 1969 |
TV camera placed in final deployment position (CDR). |
110:02:53 |
03:34:53 |
21 Jul 1969 |
Solar wind composition experiment deployed (LMP). |
110:03:20 |
03:35:20 |
21 Jul 1969 |
United States flag deployed (CDR, LMP). |
110:09:43 |
03:41:43 |
21 Jul 1969 |
Evaluation of surface mobility started (LMP). |
110:13:15 |
03:45:15 |
21 Jul 1969 |
Evaluation of surface mobility end (LMP). |
110:16:02 |
03:48:02 |
21 Jul 1969 |
Presidential message from White House and response from CDR. |
110:16:30 |
03:48:30 |
21 Jul 1969 |
Presidential message and CDR response ended. |
110:18:21 |
03:50:21 |
21 Jul 1969 |
Evaluation of trajectory of lunar soil when kicked (LMP) and bulk sample collection started (CDR). |
110:20:06 |
03:52:06 |
21 Jul 1969 |
Evaluation of visibility in lunar sunlight (LMP). |
110:10:24 |
03:42:24 |
21 Jul 1969 |
Evaluation of thermal effects of sun and shadow inside the suit (LMP). |
110:25:09 |
03:57:09 |
21 Jul 1969 |
Evaluation of surface shadows and colors (LMP). |
110:28:22 |
04:00:22 |
21 Jul 1969 |
LM landing gear inspection and photography (LMP). |
110:34:13 |
04:06:13 |
21 Jul 1969 |
Bulk sample completed (CDR). |
110:35:36 |
04:07:36 |
21 Jul 1969 |
LM landing gear inspection and photography (CDR, LMP). |
110:46:36 |
04:18:36 |
21 Jul 1969 |
Scientific equipment bay doors opened. |
110:53:38 |
04:25:38 |
21 Jul 1969 |
Passive seismometer deployed. |
110:55:42 |
04:27:42 |
21 Jul 1969 |
Lunar ranging retroreflector deployed (CDR). |
111:03:57 |
04:35:57 |
21 Jul 1969 |
1st passive seismic experiment data received on Earth. |
111:08:39 |
04:40:39 |
21 Jul 1969 |
Collection of documented samples started (CDR/LMP). |
111:11 |
04:43 |
21 Jul 1969 |
Solar wind composition experiment retrieved (LMP) . |
111:20 |
04:52 |
21 Jul 1969 |
LMP inside LM. |
111:29:39 |
05:01:39 |
21 Jul 1969 |
Transfer of sample containers reported complete. |
111:35:51 |
05:07:51 |
21 Jul 1969 |
CDR inside LM, assisted and monitored by LMP. |
111:37:32 |
05:09:32 |
21 Jul 1969 |
EVA ended (hatch closed). |
111:39:13 |
05:11:13 |
21 Jul 1969 |
LM equipment jettisoned. |
114:05 |
07:37 |
21 Jul 1969 |
LM lunar liftoff ignition (LM APS). |
124:22:00.79 |
17:54:00 |
21 Jul 1969 |
LM orbit insertion cutoff. |
124:29:15.67 |
18:01:15 |
21 Jul 1969 |
Coelliptic sequence initiation ignition. |
125:19:35 |
18:51:35 |
21 Jul 1969 |
Coelliptic sequence initiation cutoff. |
125:20:22 |
18:52:22 |
21 Jul 1969 |
Constant differential height maneuver ignition. |
126:17:49.6 |
19:49:49 |
21 Jul 1969 |
Constant differential height maneuver cutoff. |
126:18:29.2 |
19:50:29 |
21 Jul 1969 |
Terminal phase initiation ignition. |
127:03:51.8 |
20:35:51 |
21 Jul 1969 |
Terminal phase initiation cutoff. |
127:04:14.5 |
20:36:14 |
21 Jul 1969 |
LM 1st midcourse correction. |
127:18:30.8 |
20:50:30 |
21 Jul 1969 |
LM 2nd midcourse correction. |
127:33:30.8 |
21:05:30 |
21 Jul 1969 |
Braking started. |
127:36:57.3 |
21:08:57 |
21 Jul 1969 |
Terminal phase finalize ignition. |
127:46:09.8 |
21:18:09 |
21 Jul 1969 |
Terminal phase finalize cutoff. |
127:46:38.2 |
21:18:38 |
21 Jul 1969 |
Stationkeeping started. |
127:52:05.3 |
21:24:05 |
21 Jul 1969 |
CSM/LM docked. |
128:03:00 |
21:35:00 |
21 Jul 1969 |
CDR entered CM. |
129:20 |
22:52 |
21 Jul 1969 |
LMP entered CM. |
129:45 |
23:17 |
21 Jul 1969 |
LM ascent stage jettisoned. |
130:09:31.2 |
23:41:31 |
21 Jul 1969 |
CSM/LM final separation ignition. |
130:30:01.0 |
00:02:01 |
22 Jul 1969 |
CSM/LM final separation cutoff. |
130:30:08.2 |
00:02:08 |
22 Jul 1969 |
Transearth injection ignition (SPS). |
135:23:42.28 |
04:55:42 |
22 Jul 1969 |
Transearth injection cutoff. |
135:26:13.69 |
04:58:13 |
22 Jul 1969 |
Midcourse correction ignition. |
150:29:57.4 |
20:01:57 |
22 Jul 1969 |
Midcourse correction cutoff. |
150:30:07.4 |
20:02:07 |
22 Jul 1969 |
TV transmission started. |
155:36 |
01:08 |
23 Jul 1969 |
TV transmission ended. |
155:54 |
01:26 |
23 Jul 1969 |
TV transmission started. |
177:10 |
22:42 |
23 Jul 1969 |
TV transmission ended. |
177:13 |
22:45 |
23 Jul 1969 |
TV transmission started. |
177:32 |
23:04 |
23 Jul 1969 |
TV transmission ended. |
177:44 |
23:16 |
23 Jul 1969 |
CM/SM separation. |
194:49:12.7 |
16:21:12 |
24 Jul 1969 |
Entry. |
195:03:05.7 |
16:35:05 |
24 Jul 1969 |
Drogue parachute deployed |
195:12:06.9 |
16:44:06 |
24 Jul 1969 |
Visual contact with CM established by aircraft. |
195:07 |
16:39 |
24 Jul 1969 |
Radar contact with CM established by recovery ship. |
195:08 |
16:40 |
24 Jul 1969 |
VHF voice contact and recovery beacon contact established. |
195:14 |
16:46 |
24 Jul 1969 |
Splashdown (went to apex-down). |
195:18:35 |
16:50:35 |
24 Jul 1969 |
CM returned to apex-up position. |
195:26:15 |
16:58:15 |
24 Jul 1969 |
Flotation collar inflated. |
195:32 |
17:04 |
24 Jul 1969 |
Hatch opened for crew egress. |
195:49 |
17:21 |
24 Jul 1969 |
Crew egress. |
195:57 |
17:29 |
24 Jul 1969 |
Crew aboard recovery ship. |
196:21 |
17:53 |
24 Jul 1969 |
Crew entered mobile quarantine facility. |
196:26 |
17:58 |
24 Jul 1969 |
CM lifted from water. |
198:18 |
19:50 |
24 Jul 1969 |
CM secured to quarantine facility. |
198:26 |
19:58 |
24 Jul 1969 |
CM hatch reopened. |
198:33 |
20:05 |
24 Jul 1969 |
Sample return containers 1 and 2 removed from CM. |
200:28 |
22:00 |
24 Jul 1969 |
Container 1 removed from mobile quarantine facility. |
202:00 |
23:32 |
24 Jul 1969 |
Container 2 removed from mobile quarantine facility. |
202:33 |
00:05 |
25 Jul 1969 |
Container 2 and film flown to Johnston Island. |
207:43 |
05:15 |
25 Jul 1969 |
Container 1 flown to Hickam Air Force Base, Hawaii. |
214:13 |
11:45 |
25 Jul 1969 |
Container 2 and film arrived in Houston, TX. |
218:43 |
16:15 |
25 Jul 1969 |
Container 1, film, and biological samples arrived in Houston. |
225:41 |
23:13 |
25 Jul 1969 |
CM decontaminated and hatch secured. |
229:28 |
03:00 |
26 Jul 1969 |
Mobile quarantine facility secured. |
231:03 |
04:35 |
26 Jul 1969 |
Mobile quarantine facility and CM offloaded. |
250:43 |
00:15 |
27 Jul 1969 |
Safing of CM pyrotechnics completed. |
252:33 |
02:05 |
27 Jul 1969 |
Mobile quarantine facility arrived at Ellington AFB, Houston. |
280:28 |
06:00 |
28 Jul 1969 |
Crew in Lunar Receiving Laboratory, Houston |
284:28 |
10:00 |
28 Jul 1969 |
CM delivered to Lunar Receiving Laboratory. |
345:45 |
23:17 |
30 Jul 1969 |
Passive seismic experiment turned off. |
430:26:46 |
11:58:46 |
03 Aug 1969 |
Crew released from quarantine. |
|
|
10 Aug 1969 |
CM delivered to contractor’s facility in Downey, CA. |
|
|
14 Aug 1969 |
EASEP turned off by ground command. |
|
|
27 Aug 1969 |